Central Coast Development Guide

What’s being built on the Central Coast?

Explore proposed, approved, under-construction and recently completed developments across the Five Cities and San Luis Obispo.

A public guide to local development

This guide documents development projects we could trace in public records across the Five Cities and San Luis Obispo: what was proposed, what was approved, what is under construction and what has been completed since November 3, 2021.

It is drawn from a research file we maintain of permits, applications, hearing materials and environmental notices. Each project page shows its sources and the date behind its status, keeps application, approval, permit, construction and completion as separate events, and says what the records leave unclear. This guide presents selected substantial projects. For individual ADUs, small residential permits and the broader five-year inventory, use the full Coastal Development Atlas. Both resources describe their coverage gaps.

Any documented Glenn Martin Company role is disclosed on the relevant project page. We publish this because owners, buyers and tenants ask us what is going in next door, and a useful starting point is the documented scope, status and source.

Research last reviewed November 3, 2026; records cover November 3, 2021 to November 3, 2026. How the guide is built, and what it does not cover.

Featured projects

Chosen for scale, public interest or how much they change a block, not for any connection to the firm.

ApprovedMixed-use

1717 Shell Beach Road mixed-use

1717 Shell Beach Road, Pismo Beach, CA (Shell Beach)

Two commercial condominiums totaling about 2,086 square feet and seven residential studio condominiums, plus one ADU.

Status as of June 9, 2026

Under constructionHousing

Arroyo Terrace

700 Oak Park Boulevard, Arroyo Grande, CA

62 affordable apartments. Reported under construction in March 2026 with completion and leasing expected in late 2026.

Status as of September 16, 2026

Under constructionMixed-use

Encore mixed-use development

401 W Grand Avenue, Grover Beach, CA

59 homes and 6,900 square feet of nonresidential space.

Status as of March 2026

ApprovedMixed-use

Ocean Terraces at Gateway

1331 Price Street, Pismo Beach, CA

The developer describes a mixed-use redevelopment at Price and Dolliver with 34 homes, including five affordable units, retail and a public plaza. These are developer-reported figures.

Status as of November 3, 2026

CompletedCivic

Oceano Memorial Park playground replacement

Oceano Memorial Park, Oceano

Playground equipment and surfacing were replaced, drainage resilience improved, and benches and accessible walkways added.

Status as of November 3, 2026

Under constructionCivic

Righetti Community Park phase 1

1203 Tiburon Way, San Luis Obispo

Community park first-phase fields, playground, pathways and recreation amenities.

Status as of April 1, 2026

All projects in the guide

Search by name or location, or narrow the list by area, status and type. The map shows the same projects as the list.

Area
Status
Type

40 of 40 projects shown.

Pins mark representative locations, not construction footprints. 9 of the 40 projects have no mapped point and appear in the list only. Map data © OpenStreetMap contributors.

ApprovedMixed-use

1598 El Camino Real hotel and housing, phase 2

1598 El Camino Real, Grover Beach, CA

Phase 2: Development of a four-story hotel, consisting of 60 rooms. The project also includes 7 single-family residences.

Status as of October 14, 2026

ApprovedMixed-use

1717 Shell Beach Road mixed-use

1717 Shell Beach Road, Pismo Beach, CA (Shell Beach)

Two commercial condominiums totaling about 2,086 square feet and seven residential studio condominiums, plus one ADU.

Status as of June 9, 2026

Under constructionTransportation

2025 Pavement Management Program overlay

Multiple city streets, Arroyo Grande, CA

Current overlay contract within the city pavement program. Other annual contracts are separate.

Status as of October 2026

ApprovedHousing

330 Harloe condominiums

330 Harloe Avenue, Pismo Beach, CA

Four residential airspace condominiums; two-year permit extension requested.

Status as of August 25, 2026

ProposedMixed-use

501 West Grand Avenue mixed-use proposal

501 W Grand Avenue, Grover Beach, CA

Development Application for a four-story mixed-use project consisting of 2,300 square feet of commercial space, and 30 residential units.

Status as of October 14, 2026

Under constructionHousing

Arroyo Terrace

700 Oak Park Boulevard, Arroyo Grande, CA

62 affordable apartments. Reported under construction in March 2026 with completion and leasing expected in late 2026.

Status as of September 16, 2026

ApprovedIndustrial

Astound broadband distribution center

550 Farroll Road, Grover Beach, CA

Development of a single-story Broadband Communication Distribution Center, consisting of 9,781 square feet of non-residential space, across four structures.

Status as of October 14, 2026

CompletedHousing

Balay Ko on Barca

955 South 4th Street, Grover Beach, CA

Thirty temporary housing cabins on city-owned land. Separate facility from Cabins for Change.

Status as of August 25, 2025

Under constructionMixed-use

Bridge Street mixed-use project

279 Bridge Street, San Luis Obispo, CA

The development of a mixed-use facility featuring a three-story multi-family residential complex with 94 affordable units and 924 square feet of commercial space.

Status as of September 2026

CompletedHousing

Cabins for Change

1523 B Long Branch Avenue, Grover Beach, CA

Twenty cabins with shared services and case management.

Status as of April 8, 2024

CompletedHousing

Cleaver and Clark Commons

1206 W Grand Avenue and 164 S 13th Street, Grover Beach, CA

53-unit affordable housing development.

Status as of March 2026

CompletedInfrastructure

Cliff Avenue and Ocean Boulevard utility undergrounding

Cliff Avenue and Ocean Boulevard, Pismo Beach, CA (Shell Beach)

Overhead utilities were undergrounded along the bluff. Council approved the completion notice September 15, 2026.

Status as of October 6, 2026

ApprovedHousing

Creekside Junction

1271 James Way, Arroyo Grande, CA

92 apartments in two four-story buildings; 14 income-restricted homes.

Status as of April 16, 2026

CompletedTransportation

Cultural Arts District Parking Garage

Palm, Nipomo and Monterey streets, San Luis Obispo

Downtown multilevel parking garage serving the cultural district.

Status as of November 3, 2026

CompletedCivic

Dinosaur Caves playground expansion

Dinosaur Caves Park, Pismo Beach, CA (Shell Beach)

Expanded play area and relocated friendship swing. Final playground inspection completed August 2026.

Status as of October 6, 2026

ApprovedHospitality

El Camino Real hotel and car wash

727 El Camino Real, Arroyo Grande, CA

22-room hotel, pool, automated drive-through car wash and self-service vacuum area.

Status as of November 2024

ApprovedCivic

Eldwayen Park sidewalk reroute

Eldwayen Park, Pismo Beach, CA (Shell Beach)

Replace the park sidewalk with a decomposed granite path farther from the bluff edge. October construction was anticipated.

Status as of October 6, 2026

Under constructionMixed-use

Encore mixed-use development

401 W Grand Avenue, Grover Beach, CA

59 homes and 6,900 square feet of nonresidential space.

Status as of March 2026

Status not determinedMixed-use

Froom Ranch

Froom Ranch, San Luis Obispo

Froom Ranch is a mixed-use master development with housing, senior care, hospitality, commercial uses and open space.

Status as of September 2026

ApprovedHospitality

Grover Beach Lodge

55 W Grand Avenue, Grover Beach, CA

Development of a three-story hotel/lodge, consisting of 144 rooms across 3 separate structures.

Status as of October 14, 2026

ApprovedTransportation

Halcyon Complete Streets

Halcyon Road, El Camino Real to Farroll Avenue, Arroyo Grande, CA

Roundabout at Fair Oaks, sidewalks, cycle lanes, utilities and resurfacing.

Status as of 2026

CompletedInfrastructure

Mid-Higuera Bypass flood-control project

South Higuera Street, Marsh Street to Madonna Road, San Luis Obispo

Flood-capacity improvements and replacement of Bianchi Lane Bridge.

Status as of April 6, 2026

ApprovedInfrastructure

Ocean Boulevard and Cliff coastal trail protection

Cliff Avenue and Ocean Boulevard, Pismo Beach, CA (Shell Beach)

Public trail, street and utility protection: sidewalks and railings, trail relocation around a sea cave, a 1,800-square-foot bluff wall, 14 tiebacks,

Status as of May 27, 2025

ApprovedMixed-use

Ocean Terraces at Gateway

1331 Price Street, Pismo Beach, CA

The developer describes a mixed-use redevelopment at Price and Dolliver with 34 homes, including five affordable units, retail and a public plaza. These are developer-reported figures.

Status as of November 3, 2026

ApprovedInfrastructure

Oceano-Halcyon water-system consolidation

Halcyon, CA, Oceano

Connect Ken-Mar Gardens, Halcyon Water System, Halcyon Estates and Grande Mobile Manor to OCSD; add pipelines, meters, hydrants and laterals.

Status as of September 15, 2026

CompletedCivic

Oceano Memorial Park playground replacement

Oceano Memorial Park, Oceano

Playground equipment and surfacing were replaced, drainage resilience improved, and benches and accessible walkways added.

Status as of November 3, 2026

ProposedInfrastructure

Oceano sewer upgrades: CIPs A-3, A-4 and A-7

1323 19th Street, Oceano, CA

Replace existing sewer mains and laterals along portions of Belridge Street, Wilmar Avenue, 19th Street and Nipomo Street. Work remains within road rights of way and does not expand service.

Status as of September 15, 2026

Status not determinedHousing

Oceanview Apartments

1273 Belridge Street, Oceano, CA

27-unit multifamily proposal on about 1.79 acres.

Status as of September 21, 2022

CompletedMixed-use

Palladium mixed-use development

402 W Grand Avenue, Grover Beach, CA

37 homes and 2,605 square feet of commercial space.

Status as of March 2026

ProposedTransportation

Pier Avenue multimodal betterments

Pier Avenue and Highway 1, Oceano, CA

New pavement, striping and curb ramps on Pier Avenue in Oceano. Grind and overlay of new pavement. Striping will be updated to match the Pier Avenue Corridor Plan.

Status as of 2026

Under constructionCivic

Pismo Beach Public Safety Facility

1000 Bello Street, Pismo Beach, CA

New police and fire stations. Final installation, commissioning and move-in remained underway; contract completion was forecast for December 2026.

Status as of October 6, 2026

ProposedTransportation

Prado Road interchange

Prado Road and US Highway 101, San Luis Obispo, CA

New interchange and bridge connections, with bicycle and pedestrian facilities.

Status as of November 3, 2026

Under constructionCivic

Righetti Community Park phase 1

1203 Tiburon Way, San Luis Obispo

Community park first-phase fields, playground, pathways and recreation amenities.

Status as of April 1, 2026

ApprovedEducation

Shell Beach Elementary classroom replacement, phase 1

2100 Shell Beach Road, Pismo Beach, CA (Shell Beach)

Replace six portable buildings with two permanent buildings containing six classrooms, two bathrooms, a custodian closet and an IT data room. Separate from the 2026 second phase.

Status as of May 13, 2025

On hold or withdrawnTransportation

Shell Beach Road shared use path phases 2 and 3

Shell Beach Road from Avila Beach Drive to Terrace Drive, Pismo Beach, CA (Shell Beach)

Phase 2 connects Avila Beach Drive to Spyglass Drive; phase 3 continues to Terrace Drive. Phase 2 design paused for construction funding shortfall; combined grant strategy being prepared.

Status as of October 6, 2026

CompletedTransportation

Swinging Bridge rehabilitation

Swinging Bridge at Centennial Park, Arroyo Grande, CA

Restoration of the historic pedestrian crossing of Arroyo Grande Creek.

Status as of August 30, 2024

CompletedTransportation

Traffic Way Bridge replacement

Traffic Way at Arroyo Grande Creek, Arroyo Grande, CA

Replacement of the deficient creek bridge.

Status as of April 28, 2026

Under constructionCivic

Ventana sports courts

Ventana Drive at Chumash Park, Pismo Beach, CA

One tennis court, two pickleball courts, parking and crosswalk to Chumash Park. Court paving took place September 23, 2026.

Status as of October 6, 2026

About the sources and dates

Statuses are tied to the cited evidence, with an “as of” date and an explanation of its basis. An undated source uses an explicitly identified research check date. A permit marked closed is not treated as proof that a whole development is finished, and an old construction schedule is never turned into a claim that building is under way today. Where a record could not be verified, the page keeps its original date and says so.

Research last reviewed November 3, 2026; records cover November 3, 2021 to November 3, 2026. How the guide is built, and what it does not cover.

Discuss a property or location

Own property near one of these projects, thinking about buying or leasing nearby, or planning something of your own? Tell us where, and what you want to know.

Or call 805.234.5912. You will hear back from a principal of the firm, Samuel Fox Brennan or Glenn Thomas Martin.