Orchard rows climbing a hillside above Arroyo Grande

City of Arroyo Grande

Development in Arroyo Grande

Housing, commercial and civic projects in the city where our office sits, with the status each one had when its records were last reviewed.

Building in Arroyo Grande

Arroyo Grande is an incorporated city in San Luis Obispo County, and its land-use decisions run through the City: the Community Development Department reviews applications, the Planning Commission and City Council hear the larger ones, and the Building Division issues the permits. Our office is on Traffic Way, a few blocks from the Village, so most of the places on this page are a short drive away.

Development here tends to follow the city's two commercial spines. East Grand Avenue carries the shopping centers, offices and highway-serving businesses; East Branch Street runs through the Village, where buildings are older and smaller and any change has to fit its neighbors. Housing fills in around both, from infill lots and accessory units to larger subdivisions on the city's edges.

This guide selects projects from the city's own records and public hearing materials. It is not a complete permit register: single-family remodels, roofs, water heaters and similar minor permits are left out on purpose, and the research notes a gap in minor-work and 2026 housing coverage for Arroyo Grande that is described on the methodology page.

Projects in Arroyo Grande

Of the 8 Arroyo Grande projects selected for this guide, 2 under construction, 3 approved but not yet documented as started, 1 proposed or under review and 2 completed within the research window, each as of the date shown on its page. By type: 3 housing, 3 transportation, 1 hospitality and 1 civic. These are counts of the projects we chose to document, not of every permit the city or county issued.

Status
Type

8 of 8 projects shown.

Pins mark representative locations, not construction footprints. 3 of the 8 projects have no mapped point and appear in the list only. Map data © OpenStreetMap contributors.

ProposedCivic

Arroyo Grande Community Hospital rehabilitation hospital

345 South Halcyon Road, Arroyo Grande, CA

Dignity Health and LifePoint Health propose a new inpatient rehabilitation hospital, to be called Dignity Health Central Coast Rehabilitation Hospital,

Status as of August 20, 2026

Under constructionHousing

Arroyo Terrace

700 North Oak Park Boulevard, Arroyo Grande, CA

Arroyo Terrace is an affordable apartment community at 700 North Oak Park Boulevard in Arroyo Grande. The developer is the San Luis Obispo Nonprofit Housing Corporation,

Status as of September 16, 2026

ApprovedHousing

Creekside Junction

1271 and 1281 James Way, Arroyo Grande, CA

Creekside Junction is an approved 92-apartment project at 1271 and 1281 James Way, near Oak Park Boulevard in Arroyo Grande.

Status as of April 16, 2026

ApprovedHospitality

El Camino Real hotel and car wash

727 El Camino Real, Arroyo Grande, CA

This project is a 22-room hotel with a lobby, swimming pool and dedicated parking, together with an automated drive-through car wash and self-service vacuum area,

Status as of November 25, 2024

Under constructionTransportation

Halcyon Complete Streets

Halcyon Road, El Camino Real to Farroll Avenue, Arroyo Grande, CA

The Halcyon Complete Streets Project rebuilds about 1.2 miles of Halcyon Road in Arroyo Grande as a street for all users.

Status as of October 28, 2026

ApprovedHousing

Nelson and Short Street duplexes and ADUs

134 Nelson Street, at Short Street, Arroyo Grande, CA

This small infill project adds two duplexes, each with two accessory dwelling units, on two parcels at 134 Nelson Street at the corner of Short Street in the Arroyo Grande Village,

Status as of February 27, 2026

CompletedTransportation

Swinging Bridge rehabilitation

Swinging Bridge at Centennial Park, Arroyo Grande, CA

The Swinging Bridge is a historic pedestrian suspension bridge over Arroyo Grande Creek between the Village and Centennial Park.

Status as of August 30, 2024

CompletedTransportation

Traffic Way Bridge replacement

Traffic Way at Arroyo Grande Creek, Arroyo Grande, CA

The City of Arroyo Grande replaced the Traffic Way Bridge over Arroyo Grande Creek, at the southern entrance to the Village. The original bridge,

Status as of February 4, 2026

What the status labels mean
Proposed
An application is on file or under review. No approval is documented.
Approved
An entitlement or permit has been granted. Construction is not documented as started.
Under construction
Construction activity is reported by the cited source. This does not imply an independent inspection of the site or permit file.
Completed
Completion is documented: a final inspection, certificate of occupancy, opening or equivalent.
On hold or withdrawn
The application was withdrawn, expired or paused according to the cited source.
Status not determined
The records reviewed do not establish the current status.

Questions about building in Arroyo Grande

Who approves development projects in Arroyo Grande?

The City of Arroyo Grande. The Community Development Department reviews applications, the Planning Commission and City Council hear the larger ones, and the Building Division issues permits. The County is not involved inside the city limits.

How can I find out what is planned next to my property in Arroyo Grande?

Start with the project pages here, then check the City's agendas and staff reports, which are public. If you own property nearby and want a read on what a project means for you, use the form on this page.

Does Glenn Martin Company have a role in these projects?

No, unless a project page says so. The guide is a research resource we publish because clients ask us what is being built.

Which projects in Arroyo Grande are under construction?

As of the dates on their pages: Arroyo Terrace and Halcyon Complete Streets. Each page names the record that reports construction and the date it was checked.

What is approved in Arroyo Grande but not yet documented as started?

Creekside Junction, El Camino Real hotel and car wash and Nelson and Short Street duplexes and ADUs. An approval or an issued permit is not the same as construction, so these stay listed as approved until a record reports work under way.

What is proposed or under review in Arroyo Grande?

Arroyo Grande Community Hospital rehabilitation hospital. These have applications or plans on file but no approval documented in the records reviewed.

What has been completed in Arroyo Grande since late 2021?

Swinging Bridge rehabilitation and Traffic Way Bridge replacement, according to the completion records cited on each page.

Talk with us about a property in Arroyo Grande

Whether you own a site near one of these projects, are thinking about buying or leasing nearby, or want a second opinion on a plan, tell us where and what you have in mind.

Or call 805.234.5912. You will hear back from a principal of the firm, Samuel Fox Brennan or Glenn Thomas Martin.