San Luis Obispo · City of San Luis Obispo
Bridge Street Mixed-Use Project
279 Bridge Street, San Luis Obispo, CA
The pin marks a representative location from the cited records, not a verified construction footprint. Map data © OpenStreetMap contributors.
Summary
The Bridge Street project is an affordable mixed-use development at 279 Bridge Street, near the South Hills open space in San Luis Obispo. The city describes the whole project as a three-story multifamily complex of 94 affordable apartments with 924 square feet of commercial space. It is being built in phases by the Housing Authority of San Luis Obispo's nonprofit development affiliate.
The first phase, marketed as Meadow Creek, is a family apartment building of about 30 affordable units with an on-site office, laundry, an outdoor common area with a play structure and a community room. The housing authority's January 2025 report expected the Bridge Street family building to lease up by the end of 2025, and in November 2025 it opened applications for the new community. The housing authority's February 2026 brochure lists Meadow Creek among its projects.
The city's 2025 General Plan Annual Report records Phase 1 as under construction and Phases 2 and 3 as seeking financing. The September 2026 city tracker still lists the project as under construction. No permit, financing award or start date for the later phases is documented in the records checked.
Documented scope
- Units (whole project)
- 94 affordable apartments in a three-story complex, with 924 square feet of commercial space [2]
- Phase 1 (Meadow Creek)
- About 30 affordable family apartments; owner Bridge Street P1, L.P.; architect Ten Over Studio [5]
- Phasing
- Phase 1 under construction; Phases 2 and 3 seeking financing (2025 annual report) [3]
Milestones
- Housing authority report listed the Bridge Street family building for lease-up by the end of 2025. [4]
- Housing authority opened applications for the new Bridge Street community. [6]
- Housing authority brochure listed Meadow Creek (Phase 1) among its projects. [5]
Dates are shown with the precision the source gives: a month or a year when the record has no exact day.
What changed
- City tracker update keeps the project in the under-construction list. [1]
- Housing authority brochure lists Meadow Creek, the Phase 1 family building, with about 30 affordable units. [5]
- Applications opened for the Phase 1 apartments at 279 Bridge Street. [6]
What the records leave open
- The under-construction status applies to Phase 1. The 94-unit figure is the whole project; later phases were seeking financing at the end of 2025 and no later record on them was found.
- Phase 1 was expected to lease up by the end of 2025 and applications opened in November 2025, which suggests the first building is complete or nearly so, but no certificate of occupancy or completion notice was found. The city tracker still shows the project as under construction.
- The housing authority brochure gives 30 units for Meadow Creek; a 2023 city staff report reported in the research summary gives 31 units including a manager's unit. The exact Phase 1 count is not confirmed.
- The 2025 annual report was not re-checked; the tracker stage was not confirmed by a site inspection or permit-file review.
More in San Luis Obispo
Sources
- Current Development Projects (City of San Luis Obispo development tracker), City of San Luis Obispo, September 21, 2026 (checked November 5, 2026) Story map shows 'Updated September 2026'; page metadata gives a September 21, 2026 modification date.
- Tracker record: Bridge St. Project (Under Construction layer), City of San Luis Obispo, September 2026 (checked November 5, 2026)
- City of San Luis Obispo 2025 General Plan Annual Report, City of San Luis Obispo, 2026 Not re-checked on November 5, 2026; date and content from the research file. The host answers automated requests with a browser check.
- Housing Authority of San Luis Obispo board agenda packet, January 16, 2025 (upcoming lease-ups), Housing Authority of San Luis Obispo, January 16, 2025 (checked November 5, 2026)
- HASLO Marketing Brochure 2026 (Meadow Creek project page), Housing Authority of San Luis Obispo, February 23, 2026 (checked November 5, 2026)
- Applications open for new affordable housing complex in San Luis Obispo, KSBY (news), November 20, 2025 (checked November 5, 2026)
Research reviewed November 3, 2026. Page content reviewed November 5, 2026. Guide last updated November 5, 2026. Research last reviewed November 3, 2026; records cover November 3, 2021 to November 3, 2026. How the guide is built, and what it does not cover.
Discuss this location with a broker
Buying, selling or leasing near Bridge Street Mixed-Use Project, or planning something of your own nearby? Tell us what you have in mind and we will give you a straight read on the location.
Or call 805.234.5912. You will hear back from a principal of the firm, Samuel Fox Brennan or Glenn Thomas Martin.