San Luis Obispo · City of San Luis Obispo
Maxine Lewis Apartments
736 Orcutt Road, San Luis Obispo, CA
The pin marks a representative location from the cited records, not a verified construction footprint. Map data © OpenStreetMap contributors.
Summary
Maxine Lewis Apartments, now called Maxine Lewis Grove by the housing authority, is a permanent supportive housing building at 736 Orcutt Road in San Luis Obispo, on the site of the former Maxine Lewis Memorial Shelter. The project is 39 affordable apartments for tenants referred through the county's Continuum of Care, with supportive services, an on-site resident manager, an office, laundry and a community space, plus about 850 square feet of existing commercial space. The owner is Orcutt Road, L.P. and the developer is the housing authority's nonprofit affiliate; the city's report counts the project as 40 units.
Demolition began in early February 2024 and the general contractor then expected completion in mid-to-late summer 2025. By mid-January 2025 the building was being framed, and the housing authority's January 2025 board report listed Maxine Lewis for lease-up at the end of 2025. The city's 2024 General Plan Annual Report lists it under construction.
The housing authority's February 2026 brochure lists Maxine Lewis Grove among its projects without stating a completion date, and no opening announcement was found. The building is likely finished or close to it, but the records checked do not confirm completion.
Documented scope
- Units
- 39 affordable supportive housing units (housing authority); the city report counts 40 [4]
- Other space
- Community space and about 850 square feet of existing commercial space [3]
- Tenants
- Continuum of Care referrals with supportive services [4]
Milestones
- Demolition of the former shelter began; general contractor Abbott Reed expected completion in mid-to-late summer 2025. [3]
- County Homeless Services Oversight Council heard that construction had started and the building was being framed. [5]
- Housing authority board report listed lease-up at the end of 2025. [2]
- Housing authority brochure lists Maxine Lewis Grove, 39 affordable units. [4]
Dates are shown with the precision the source gives: a month or a year when the record has no exact day.
What changed
- Housing authority brochure lists the project as Maxine Lewis Grove, 39 affordable units; no completion date stated. [4]
- Housing authority expected lease-up at the end of 2025. [2]
What the records leave open
- No certificate of occupancy, opening announcement or lease-up notice was found. The under-construction status rests on records from January 2025 and the 2024 city report; the building may have been completed since.
- Unit counts differ: 39 (contractor and housing authority) and 40 (city report, which likely includes a manager's unit). The 2024 annual report was not re-checked.
- This is not the separate 15-unit Orcutt Road Apartments project listed in the research file, and not the Vintage at SLO apartments in the Orcutt area.
More in San Luis Obispo
Sources
- City of San Luis Obispo 2024 General Plan Annual Report, City of San Luis Obispo, 2025 Not re-checked on November 5, 2026; date and content from the research file (project listed under construction; forty affordable homes on the former shelter site). The host answers automated requests with a browser check.
- Housing Authority of San Luis Obispo board agenda packet, January 16, 2025 (upcoming lease-ups), Housing Authority of San Luis Obispo, January 16, 2025 (checked November 5, 2026)
- Project Groundbreaking: Maxine Lewis Apartments, Abbott Reed (general contractor announcement), February 9, 2024 (checked November 5, 2026)
- HASLO Marketing Brochure 2026 (Maxine Lewis Grove project page), Housing Authority of San Luis Obispo, February 23, 2026 (checked November 5, 2026)
- Homeless Services Oversight Council agenda packet, January 15, 2025 (minutes noting Maxine Lewis construction), County of San Luis Obispo, January 15, 2025 (checked November 5, 2026)
Research reviewed November 3, 2026. Page content reviewed November 5, 2026. Guide last updated November 5, 2026. Research last reviewed November 3, 2026; records cover November 3, 2021 to November 3, 2026. How the guide is built, and what it does not cover.
Discuss this location with a broker
Buying, selling or leasing near Maxine Lewis Apartments, or planning something of your own nearby? Tell us what you have in mind and we will give you a straight read on the location.
Or call 805.234.5912. You will hear back from a principal of the firm, Samuel Fox Brennan or Glenn Thomas Martin.