Pismo Beach · City of Pismo Beach

Ocean Terraces at Gateway

1481, 1331 and 1370 Price Street (block bounded by Price Street, Dolliver Street, Bay Street and Harloe Avenue), Pismo Beach, CA

Approvedas of December 16, 2025Mixed-use

The pin marks a representative location from the cited records, not a verified construction footprint. Map data © OpenStreetMap contributors.

Summary

The Gateway project, marketed by its developer as Ocean Terraces at Gateway, is a three-story mixed-use condominium development on five parcels totaling 1.2 acres at the north entrance to downtown Pismo Beach, on the block bounded by Price Street, Dolliver Street, Bay Street and Harloe Avenue. The approved plans show 39 residential condominiums totaling about 53,400 square feet, five of them deed restricted for sale to low- and very-low-income households, and four commercial condominium spaces totaling about 5,700 square feet. It replaces the existing homes and a former gas station with street improvements, 21 public parking spaces, a one-way Bay Street and a public plaza at Price and Dolliver.

The applicant is Coastal Community Builders. The project was processed under state density bonus law and Senate Bill 330, with a parking concession and waivers for building height (up to 45 feet on the sloped site), setbacks and fence height. After a concept review in September 2024 and hearings in May and June 2025, the Planning Commission approved the permits and Vesting Tentative Tract Map 3240 on June 10, 2025. Two appeals were filed that month. On September 2, 2025 the City Council denied both appeals and upheld the approval with revised plans that dropped two waivers and added parking.

In December 2025 the City Council authorized closing Bay Street between Price and Dolliver during construction, which the City then expected to begin in late February 2026 and last 18 to 24 months, with the street reopened by July 1, 2027. The records reviewed do not document a building permit or a construction start. The developer's marketing page, as recorded in the research file, describes 34 homes; the approved plans show 39, and the difference has not been reconciled against a permit record.

Documented scope

Residential units
39 residential condominiums, about 53,400 square feet in total, as approved [1]
Affordable units
5 units deed restricted for sale to low- and very-low-income households [1]
Commercial space
4 commercial condominium spaces, about 5,700 square feet [1]
Site
Five parcels, 1.2 acres, to be re-subdivided as two lots (Vesting Tentative Tract Map 3240) [1]
Height
Three stories; up to 45 feet on portions of the sloped site under a density bonus waiver from the 35-foot downtown limit [1]
Parking
66 on-site spaces; 21 new public on-street spaces (15 vehicle and 6 motorcycle) built by the applicant and counted toward the requirement as a density bonus concession [1]
Public improvements
Public Gateway plaza at Price and Dolliver, street improvements, conversion of Bay Street to one-way [1]
Construction schedule (as of December 2025)
Start expected late February 2026; 18 to 24 months; Bay Street closed during construction and reopened by July 1, 2027 [2]

Milestones

  1. Planning Commission conceptual review of the Gateway project; comments only, no action. [4]
  2. Planning Commission public hearing; hearing continued so the notice could state the corrected unit count. [1]
  3. Planning Commission approved project P24-000074 (coastal development permit, conditional use permit, architectural review permit, Vesting Tentative Tract Map 3240) and Categorical Exemption 2025-013. [3]
  4. Second of two appeals of the approval filed (the first was filed June 18, 2025). [1]
  5. City Council denied both appeals and upheld the Planning Commission approval, with revised plans removing two waivers and adding one more public parking space. [2]
  6. City Council authorized temporary closure of Bay Street between Price and Dolliver during construction; construction expected to begin late February 2026. [2]

Dates are shown with the precision the source gives: a month or a year when the record has no exact day.

What changed

  • City Council authorized closing Bay Street between Price and Dolliver during construction, which the City expected to start in late February 2026 and run 18 to 24 months. [2]
  • City Council denied two appeals and upheld the June 2025 Planning Commission approval, with revised plans. [2]

What the records leave open

  • The records reviewed stop at the December 16, 2025 council action. Whether construction began in 2026 as expected, and whether building permits were issued, was not verified.
  • The developer's marketing page, as recorded in the research file, describes 34 homes; the approved plans and the council record describe 39 residential condominiums. This page keeps the approved figure.
  • The project addresses appear as 1481, 1331 and 1370 Price Street in City records (one agenda lists 1370 Dolliver Street). The map point is the geocode for 1331 Price Street only.

Related projects and phases

More in Pismo Beach

All Pismo Beach projects

Sources

  1. Appeal of Planning Commission Approval of the Gateway Project (P24-000074), City Council staff report, Item 11.A, City of Pismo Beach, September 2, 2025 (checked November 5, 2026)
  2. Temporary Closure of a Portion of Bay Street During Construction of the Gateway Project, City Council staff report, Item 9.D, City of Pismo Beach, December 16, 2025 (checked November 5, 2026)
  3. Gateway Project, A Proposed Commercial/Residential Mixed-Use Development, Planning Commission staff report, Item 7.A, City of Pismo Beach, June 10, 2025 (checked November 5, 2026)
  4. Planning Commission agenda, September 10, 2024 (Item 8.A, Conceptual Review for the Gateway Project), City of Pismo Beach, September 10, 2024 (checked November 5, 2026)
  5. Gateway Project in Pismo Beach approved by city council, KSBY News, September 15, 2025 (checked November 5, 2026) News report; used only for the account of the council meeting.
  6. Ocean Terraces at Gateway, developer project page, Coastal Community Builders Not re-checked on November 5, 2026; date and content from the research file, which checked the page on November 3, 2026 and recorded 34 homes including five affordable units. The host could not be reached from the editorial environment.

Research reviewed November 3, 2026. Page content reviewed November 5, 2026. Guide last updated November 5, 2026. Research last reviewed November 3, 2026; records cover November 3, 2021 to November 3, 2026. How the guide is built, and what it does not cover.

Discuss this location with a broker

Buying, selling or leasing near Ocean Terraces at Gateway, or planning something of your own nearby? Tell us what you have in mind and we will give you a straight read on the location.

Or call 805.234.5912. You will hear back from a principal of the firm, Samuel Fox Brennan or Glenn Thomas Martin.