Pismo Beach Public Safety Facility

1000 Bello Street (Bello Street and Wadsworth Avenue), Pismo Beach, CA

Completedas of October 6, 2026Civic

The pin marks a representative location from the cited records, not a verified construction footprint. Map data © OpenStreetMap contributors.

Summary

The Pismo Beach Public Safety Facility is a new police station and fire station built by the City of Pismo Beach at 1000 Bello Street, on the site of the former city hall, the old police station and Fire Station 64. The permit application described a 19,027-square-foot police station, a 13,898-square-foot fire station, an accessory vehicle storage building, parking and landscaping on six lots totaling 87,432 square feet. The design keeps the facade of the city's original elementary school, which stood on the site. The City's goals were to cut fire response times by more than a minute and to replace the outdated police station.

The City Council directed staff to proceed on May 2, 2023 and on July 18, 2023 approved a $42,366,450 design-build agreement with F&H Construction and LDA Architects, with total project cost then estimated at about $50.1 million. The Planning Commission heard the coastal development permit, architectural review permit and conditional use permit (P23-000089) on November 28, 2023. The contract start date was August 15, 2023; demolition and site work were reported in October 2024, and news reports place the start of construction in summer 2024. The original completion date of November 30, 2025 slipped, and in January 2026 the City expected completion in April 2026.

The City held a ribbon-cutting on May 11, 2026. The October 6, 2026 capital improvement report lists the facility among completed projects while noting that final electrical work, cabinets and lockers were still being installed, mechanical and HVAC commissioning was ongoing, and move-in, the dispatch center and decommissioning of the temporary facilities were on schedule, with the final notice of completion expected in December 2026. Funding came from a voter-approved one percent transient occupancy tax set-aside, parking revenue and 2024 lease revenue bonds.

Documented scope

Police station
19,027 square feet (permit application); news reports at opening described about 22,000 square feet [5]
Fire station
13,898 square feet (permit application); replaces Fire Station 64 [5]
Site
Six lots totaling 87,432 square feet at 1000 Bello Street; includes an accessory vehicle storage building, parking and landscaping [5]
Construction contract
$42,366,450 design-build agreement with F&H Construction; total estimated project cost $50,116,450 at award [4]
Contract schedule
Start August 15, 2023; original completion November 30, 2025 (839 calendar days); no change orders as of October 2024 [3]
Reported final cost
About $51 million, under a budget of about $53 million, per the City Manager at the opening (news report) [6]

Milestones

  1. City Council directed staff to proceed with design, entitlement and construction. [5]
  2. City Council approved the $42,366,450 design-build agreement with F&H Construction. [4]
  3. Planning Commission hearing on the coastal development permit, architectural review permit and conditional use permit (P23-000089) and CEQA Exemption 2023-025. [5]
  4. City Council update: old city hall, old fire station and most of the old police station demolished; site work under way. [3]
  5. City Council extended consultant contracts; completion anticipated in April 2026, about four months later than planned. [2]
  6. Ribbon-cutting ceremony for the new facility (news reports). [6]
  7. Capital improvement report lists the project as completed, with commissioning and move-in continuing and the final notice of completion expected in December 2026. [1]

Dates are shown with the precision the source gives: a month or a year when the record has no exact day.

What changed

  • City capital improvement report lists the facility as completed; final installation, commissioning and move-in continuing, notice of completion expected December 2026. [1]
  • City held a ribbon-cutting for the new police and fire stations. [6]
  • Completion pushed to April 2026, about four months later than the original contract date. [2]

What the records leave open

  • Earlier versions of this page gave the status as under construction. The October 6, 2026 City report lists the facility among completed projects but describes finishing work, commissioning and move-in as still in progress, with the formal notice of completion expected in December 2026; the notice itself has not been recorded in the documents reviewed.
  • Building sizes differ between the 2023 permit application (19,027 and 13,898 square feet) and news reports at the opening (about 22,000 and 14,000 square feet). The permit figures are used here.
  • The Planning Commission's action on P23-000089 is taken from the staff report; the minutes of November 28, 2023 were not reviewed.

More in Pismo Beach

All Pismo Beach projects

Sources

  1. Capital Improvement Program Semi-Annual Report, City Council staff report, Item 12.A, City of Pismo Beach, October 6, 2026 (checked November 5, 2026)
  2. Public Safety Facility Update; Contract Amendments, City Council staff report, Item 12.C, City of Pismo Beach, January 20, 2026 (checked November 5, 2026)
  3. Public Safety Facility Project Update, City Council staff report, Item 12.A, City of Pismo Beach, October 15, 2024 (checked November 5, 2026)
  4. Agreement with F&H Construction for the Design-Build Construction of a Public Safety Facility, City Council staff report, Item 12.B, City of Pismo Beach, July 18, 2023 (checked November 5, 2026)
  5. Coastal Development Permit, Architectural Review Permit and Conditional Use Permit for the Pismo Beach Public Safety Facility (P23-000089), Planning Commission staff report, Item 7.A, City of Pismo Beach, November 28, 2023 (checked November 5, 2026)
  6. New Pismo Beach Public Safety Facility set to improve emergency response, KEYT News Channel 3-12, May 11, 2026 (checked November 5, 2026) News report of the ribbon-cutting; building sizes and cost as stated by City officials at the event.
  7. Pismo Beach celebrates new public safety facility, KSBY News, May 11, 2026 (checked November 5, 2026) News report; states construction began in summer 2024.

Research reviewed November 3, 2026. Page content reviewed November 5, 2026. Guide last updated November 5, 2026. Research last reviewed November 3, 2026; records cover November 3, 2021 to November 3, 2026. How the guide is built, and what it does not cover.

Discuss this location with a broker

Buying, selling or leasing near Pismo Beach Public Safety Facility, or planning something of your own nearby? Tell us what you have in mind and we will give you a straight read on the location.

Or call 805.234.5912. You will hear back from a principal of the firm, Samuel Fox Brennan or Glenn Thomas Martin.