La Quinta hotel at 1598 El Camino Real, phase 1

1598 El Camino Real, Grover Beach, CA

Approvedas of October 14, 2026Hospitality

The pin marks a representative location from the cited records, not a verified construction footprint. Map data © OpenStreetMap contributors.

Summary

Phase 1 of the 1598 El Camino Real project is a four-story, 93-room La Quinta hotel in northeast Grover Beach, on a roughly 7.3-acre site between El Camino Real and Oak Park Boulevard that backs onto the Laguna Court neighborhood. It is the first of two phases of a horizontal mixed-use development, Development Application 18-06, submitted by Ram Krupa Real Estate, LLC. Phase 2, tracked separately by the City, is a second hotel of 60 rooms plus seven single-family lots.

The City Council held a pre-application study session in April 2018, the application was deemed complete in November 2018, and a Mitigated Negative Declaration was released for public comment on June 14, 2019. The Planning Commission recommended approval on February 26, 2020, and the City Council heard the project on August 24, 2020, the date the City's tracker records as design approval. The approvals included a Planned Development Overlay (PD-5), a vesting tentative parcel map (Tract 3122) dividing the land into 12 lots, a use permit and a development permit, along with a financial assistance agreement and a development impact fee deferral. The 2020 plan set phase 1 as the hotel on the upper part of the site together with the shared infrastructure: a two-lane replacement bridge over Meadow Creek, the entry road, the residential street, an emergency access to Oak Park Boulevard and frontage improvements on El Camino Real.

The City's 2025 General Plan Annual Progress Report, published in March 2026, lists phase 1 as entitled and under building permit review. The City's tracker, updated October 14, 2026, still lists it under building review. No permit issuance or construction activity is documented in the records reviewed.

Documented scope

Hotel rooms
93 (phase 1) [1]
Stories
4 [1]
Site
About 7.3 acres for the whole two-phase project, with about 4.3 acres in the two hotel lots and 1.5 acres preserved as open space along Meadow Creek [3]
Parking
181 spaces shared by both hotels, as approved in 2020 [3]

Milestones

  1. City Council pre-application study session on the Northeast Grover Beach Mixed-Use Project. [3]
  2. Development Application 18-06 deemed complete. [3]
  3. Mitigated Negative Declaration 2019-02 released for a 30-day public comment period. [3]
  4. Planning Commission waived the master plan requirement and recommended approval to the City Council. [3]
  5. City Council hearing on the Mitigated Negative Declaration, Planned Development Overlay PD-5, Tract 3122, use permit and development permit; the City's tracker records design approval on this date. [1]
  6. City's annual report lists phase 1 as entitled and under building permit review. [2]
  7. City development tracker lists phase 1 under building review. [1]

Dates are shown with the precision the source gives: a month or a year when the record has no exact day.

What changed

  • The City's tracker continues to list phase 1 under building review; no building permit has been reported issued. [1]
  • The City's annual report listed phase 1 as entitled and under building permit review. [2]

What the records leave open

  • The 2020 staff report described the phase 1 hotel (Hotel B) as 85 rooms and the phase 2 hotel (Hotel A) as 91 rooms, before the Council's action. The City's current tracker and annual report give 93 rooms for phase 1 and 60 for phase 2; the City's current figures are used here and the change is not explained in the records reviewed.
  • The City's annual report says the development application was approved in September 2020, while the tracker gives August 24, 2020, the Council hearing date. The ordinance adopting the overlay zone would have required a second reading after the August hearing.
  • Being listed under building review does not establish that a permit has been issued or that construction has begun.
  • Site area, open space and parking figures describe the whole two-phase project as approved in 2020 and should not be added to the phase 2 page.

Related projects and phases

More in Grover Beach

All Grover Beach projects

Sources

  1. Current Development Projects (city development tracker), City of Grover Beach Community Development Department, October 14, 2026 (checked November 5, 2026) Online map last updated October 14, 2026.
  2. 2025 General Plan Annual Progress Report, City of Grover Beach Community Development Department, March 2026 (checked November 5, 2026) Table 6 and the Land Use Element progress table (policy 3.4).
  3. City Council staff report: Development Application 18-06, 1598 El Camino Real (two hotels and seven residences), City of Grover Beach, August 24, 2020 (checked November 5, 2026) Agenda item 13. Only the staff report portion was read; the attachments were not reviewed.

Research reviewed November 3, 2026. Page content reviewed November 5, 2026. Guide last updated November 5, 2026. Research last reviewed November 3, 2026; records cover November 3, 2021 to November 3, 2026. How the guide is built, and what it does not cover.

Discuss this location with a broker

Buying, selling or leasing near La Quinta hotel at 1598 El Camino Real, phase 1, or planning something of your own nearby? Tell us what you have in mind and we will give you a straight read on the location.

Or call 805.234.5912. You will hear back from a principal of the firm, Samuel Fox Brennan or Glenn Thomas Martin.