Arroyo Grande · City of Arroyo Grande
Swinging Bridge rehabilitation
Swinging Bridge at Centennial Park, Arroyo Grande, CA
Summary
The Swinging Bridge is a historic pedestrian suspension bridge over Arroyo Grande Creek between the Village and Centennial Park. It was built in 1875 by Newton Short to cross the creek between the two sides of his property and later became a public pathway and a symbol of the town; the city describes it as the only bridge of its kind in California. The rehabilitation project was intended to preserve the bridge's historic character while making it safe for continued use.
The City of Arroyo Grande carried out the work with Federal Community Project Funding (Congressionally Directed Spending) and local Measure O-2006 sales tax funds. The project finished more than a month ahead of schedule, and the bridge reopened to pedestrians on August 2, 2024.
On August 30, 2024 the city announced the completion and scheduled a public ribbon-cutting ceremony for September 13, 2024 at the Centennial Park gazebo. The records checked for this page do not give the contract amount or the detailed scope of the repairs.
Documented scope
- Structure
- Pedestrian suspension bridge over Arroyo Grande Creek, built 1875 [1]
- Funding
- Federal Community Project Funding (Congressionally Directed Spending) and Measure O-2006 sales tax [1]
Milestones
- Bridge reopened to pedestrians, more than a month ahead of schedule. [1]
- City announced the early completion of the rehabilitation project. [1]
- Public ribbon-cutting ceremony scheduled at the Centennial Park gazebo. [1]
Dates are shown with the precision the source gives: a month or a year when the record has no exact day.
What changed
- City press release: project complete early, bridge open to pedestrians since August 2, 2024, ribbon cutting set for September 13. [1]
What the records leave open
- The press release announced the ribbon cutting as scheduled for September 13, 2024; a record confirming that it took place was not checked.
- Contract amount, contractor and the detailed scope of the repairs are not in the record checked.
Related projects and phases
More in Arroyo Grande
Sources
- Swinging Bridge Rehabilitation Project Ribbon-Cutting Ceremony Scheduled for September 13, 2024 (press release), City of Arroyo Grande, August 30, 2024 (checked November 5, 2026)
Research reviewed November 3, 2026. Page content reviewed November 5, 2026. Guide last updated November 5, 2026. Research last reviewed November 3, 2026; records cover November 3, 2021 to November 3, 2026. How the guide is built, and what it does not cover.
Discuss this location with a broker
Buying, selling or leasing near Swinging Bridge rehabilitation, or planning something of your own nearby? Tell us what you have in mind and we will give you a straight read on the location.
Or call 805.234.5912. You will hear back from a principal of the firm, Samuel Fox Brennan or Glenn Thomas Martin.
