Oceano · County of San Luis Obispo
Pier Avenue Multi-Modal Betterments
Pier Avenue, Highway 1 to the Oceano Dunes State Park entrance, Oceano, CA
The pin marks a representative location from the cited records, not a verified construction footprint. Map data © OpenStreetMap contributors.
Summary
The Pier Avenue Multi-Modal Betterments project is a County of San Luis Obispo Public Works project on Pier Avenue in Oceano, the street that leads from Highway 1 to the Oceano Dunes State Vehicular Recreation Area entrance. It resurfaces about 0.4 miles of the street with a two-inch asphalt overlay, then restripes it to one eastbound lane, two westbound lanes and buffered bicycle lanes on both sides. The work also updates crosswalks, adds flashing beacons at a mid-block pedestrian crossing, and rebuilds curb ramps to meet the county's ADA transition plan.
The lane layout comes from the Pier Avenue Multimodal Corridor Study, prepared by DKS Associates for the county and dated October 2025, which the Board of Supervisors approved on October 7, 2025. The study lays out three phases. Phase 1, restriping and curb ramps done with repaving, is what this project builds. Phase 2 would add curb extensions at Lakeside Avenue, Air Park Drive and Norswing Drive. Phase 3 would add a separated trail on the north side between the State Park entrance and Highway 1, a new mid-block crossing west of the lagoon bridge, and a review of intersection control at Lakeside Avenue and Air Park Drive, where a roundabout was studied. Funding for Phases 2 and 3 still has to be found.
The county's capital plan for fiscal years 2026-27 through 2030-31 lists the project as number 300681 with a $1.3 million estimate and completion expected in fiscal year 2026-27. Public Works announced construction for March 16 through late May 2026 with one-way traffic control. A May 16, 2026 KSBY report said the street had been repaved and restriped with the new bike lanes, and put the cost at about $900,000. No county notice confirming completion of the whole project has been found.
Documented scope
- Length
- About 0.4 miles of Pier Avenue, from the California State Parks entrance to Highway 1 [1]
- Pavement
- Two-inch asphalt overlay on the existing roadway [1]
- Lanes after restriping
- One eastbound lane, two westbound lanes, buffered bicycle lanes [1]
- Pedestrian work
- Updated crosswalks, flashing beacons at a mid-block crossing, curb ramps rebuilt to ADA standards [1]
- County project number
- 300681 [3]
- Planning estimate
- $1,300,000 total: $100,000 approved (SB 1 Road Fund) and $1,200,000 proposed from project 300719 [3]
- Reported cost
- About $900,000 (news report) [2]
Milestones
- Pier Avenue Multimodal Corridor Study issued by DKS Associates for the County [4]
- Board of Supervisors approved the corridor study [1]
- Public Works announced construction from March 16 through late May 2026 [1]
- News report: Pier Avenue repaved and restriped with new bike lanes [2]
Dates are shown with the precision the source gives: a month or a year when the record has no exact day.
What changed
- KSBY reported new asphalt, repainted markings and new bike lane striping on Pier Avenue, with the county project manager quoted. No county completion notice has been found. [2]
- County Public Works announced weekday construction from March 16 through late May 2026: paving, restriping, crosswalks, beacons and curb ramps. [1]
- Board of Supervisors approved the Pier Avenue Multimodal Corridor Study that sets the new lane layout. [1]
What the records leave open
- No county notice of completion or final acceptance has been found. The status is kept at under construction on the strength of the March 2026 notice and the May 2026 news report; the work may well be finished.
- The $1.3 million figure is a capital plan estimate that includes $1.2 million of proposed, not yet approved, funding; the $900,000 figure comes from a news report. A final contract amount was not found.
- Phases 2 and 3 of the corridor study, including any roundabout at Lakeside Avenue and Air Park Drive, are unfunded concepts and not part of this project.
- The draft corridor plan hosted on the project website could not be re-checked; the final October 2025 study on the county site was used instead.
- The mapped point is the Pier Avenue and Highway 1 intersection, a representative point for the corridor, not a project boundary.
More in Oceano
Sources
- Expect Delays for Pier Avenue Betterments Project in Oceano, County of San Luis Obispo Department of Public Works, March 10, 2026 (checked November 5, 2026) Construction notice; cites the October 7, 2025 Board of Supervisors approval of the corridor study.
- This gateway to the Oceano Dunes just got a major facelift, KSBY News, May 16, 2026 (checked November 5, 2026) News report; used for the construction progress and the reported cost.
- Capital Improvement Plan, Fiscal Years 2026-2027 through 2030-2031, Appendix 7: project 300681, PW - Oceano - Pier Avenue Multi-Modal Betterments, County of San Luis Obispo Department of Public Works, 2026 (checked November 5, 2026) Five-year capital plan; the file's metadata is dated February 26, 2026. A plan allocation is not a construction award.
- Pier Avenue Multimodal Corridor Study, DKS Associates for the County of San Luis Obispo, October 2025 (checked November 5, 2026) Final study; phasing plan and next steps for implementation.
- Draft Final Pier Avenue Corridor Plan report, version 5.1, County of San Luis Obispo, Pier Avenue Corridor Plan project site, August 2025 Not re-checked on November 5, 2026; date and content from the research file. Superseded by the final October 2025 study on the county site.
Research reviewed November 3, 2026. Page content reviewed November 5, 2026. Guide last updated November 5, 2026. Research last reviewed November 3, 2026; records cover November 3, 2021 to November 3, 2026. How the guide is built, and what it does not cover.
Discuss this location with a broker
Buying, selling or leasing near Pier Avenue Multi-Modal Betterments, or planning something of your own nearby? Tell us what you have in mind and we will give you a straight read on the location.
Or call 805.234.5912. You will hear back from a principal of the firm, Samuel Fox Brennan or Glenn Thomas Martin.