Mixed-use and housing projects along West Grand Avenue, industrial and service buildings on the east side, and the public works that connect them.

Building in Grover Beach

Grover Beach is an incorporated city, and the City of Grover Beach reviews and permits development within its limits. The blocks closest to the ocean lie inside the California Coastal Zone, so some projects there also need a coastal development permit, which can add a step and a second set of findings before anything is built.

West Grand Avenue is the city's main street and the corridor where most of the larger recent proposals have been concentrated, from the freeway down to the beach. The east side of town, around Highland Way, Farroll Road and the Fourth Street corridor, is where the city's industrial and service-commercial buildings are, the kind of property with roll-up doors and yards that we lease and manage.

The projects listed here were selected from the city's permit reports, agendas and environmental notices for the period reviewed. Grover Beach publishes permit activity in monthly reports, and the research behind this guide notes a few reporting periods it could not obtain, so a project absent from this page is not evidence that nothing is planned there.

Projects in Grover Beach

Of the 15 Grover Beach projects selected for this guide, 4 under construction, 6 approved but not yet documented as started, 1 proposed or under review and 4 completed within the research window, each as of the date shown on its page. By type: 8 mixed-use, 3 housing, 3 hospitality and 1 industrial. These are counts of the projects we chose to document, not of every permit the city or county issued.

Status
Type

15 of 15 projects shown.

Pins mark representative locations, not construction footprints. Every project on the map is also in the list. Map data © OpenStreetMap contributors.

ApprovedMixed-use

1598 El Camino Real hotel and housing, phase 2

1598 El Camino Real, Grover Beach, CA

Phase 2 of the 1598 El Camino Real project is a four-story, 60-room hotel together with seven single-family residences in northeast Grover Beach,

Status as of October 14, 2026

ApprovedMixed-use

Mixed-use development at 261 Rockaway Avenue

261 Rockaway Avenue, Grover Beach, CA

A five-story mixed-use building is approved for 261 Rockaway Avenue in Grover Beach, a lot behind the three-story buildings that front West Grand Avenue.

Status as of October 14, 2026

ProposedMixed-use

501 West Grand Avenue mixed-use proposal

501 W Grand Avenue, Grover Beach, CA

A development application has been filed with the City of Grover Beach for a four-story mixed-use building at 501 W Grand Avenue.

Status as of October 14, 2026

Under constructionIndustrial

Astound broadband distribution center

550 Farroll Road, Grover Beach, CA

Astound Broadband is building a single-story broadband communication distribution center at 550 Farroll Road in Grover Beach.

Status as of March 2026

CompletedHousing

Balay Ko on Barca

955 South 4th Street, Grover Beach, CA

Balay Ko on Barca is a temporary emergency housing facility of 30 small cabins at 955 South 4th Street in Grover Beach, next to Barca Street.

Status as of March 2026

CompletedHousing

Cabins for Change

1523 B Long Branch Avenue, Grover Beach, CA

Cabins for Change is a temporary emergency housing facility of 20 cabins at 1523 B Long Branch Avenue in Grover Beach,

Status as of March 2026

CompletedHousing

Cleaver and Clark Commons

1206 W Grand Avenue and 164 S 13th Street, Grover Beach, CA

Cleaver and Clark Commons is a 53-unit affordable housing development at 1206 W Grand Avenue and 164 S 13th Street in Grover Beach, at the corner of West Grand Avenue and South 13th Street.

Status as of March 2026

Under constructionMixed-use

Encore mixed-use development

401 W Grand Avenue, Grover Beach, CA

Encore is a four-story mixed-use project at 401 W Grand Avenue in Grover Beach. The City describes it as 6,900 square feet of commercial and retail space and 59 residential condominiums,

Status as of March 2026

ApprovedHospitality

Grover Beach Lodge

55 W Grand Avenue, Grover Beach, CA

The Grover Beach Lodge is a planned three-story hotel at 55 W Grand Avenue in Grover Beach. The City's development tracker describes it as 144 rooms across three separate structures.

Status as of October 14, 2026

ApprovedHospitality

La Quinta hotel at 1598 El Camino Real, phase 1

1598 El Camino Real, Grover Beach, CA

Phase 1 of the 1598 El Camino Real project is a four-story, 93-room La Quinta hotel in northeast Grover Beach,

Status as of October 14, 2026

CompletedMixed-use

Palladium mixed-use development

402 W Grand Avenue, Grover Beach, CA

Palladium is a four-story mixed-use building at 402 W Grand Avenue in Grover Beach.

Status as of March 2026

ApprovedMixed-use

Sea Salt mixed-use development, 675 West Grand Avenue

675 W Grand Avenue, Grover Beach, CA

Sea Salt is an approved four-story mixed-use building at 675 W Grand Avenue in Grover Beach, on a 0.69-acre lot between North 6th and North 7th Streets in the Central Business Open zone.

Status as of October 14, 2026

Under constructionHospitality

SpringHill Suites hotel, 950 El Camino Real

950 El Camino Real, Grover Beach, CA

A four-story, 135-room SpringHill Suites hotel is being built at 950 El Camino Real in Grover Beach, on a lot of about 4.87 acres along El Camino Real.

Status as of March 2026

Under constructionMixed-use

Trinity mixed-use development, 197 West Grand Avenue

197 W Grand Avenue, Grover Beach, CA

Trinity is a four-story mixed-use project at 197 W Grand Avenue in Grover Beach, on a 1.03-acre site in the Coastal Visitor Serving zone beside the Union Pacific Railroad and Highway 1.

Status as of March 2026

What the status labels mean
Proposed
An application is on file or under review. No approval is documented.
Approved
An entitlement or permit has been granted. Construction is not documented as started.
Under construction
Construction activity is reported by the cited source. This does not imply an independent inspection of the site or permit file.
Completed
Completion is documented: a final inspection, certificate of occupancy, opening or equivalent.
On hold or withdrawn
The application was withdrawn, expired or paused according to the cited source.
Status not determined
The records reviewed do not establish the current status.

Questions about building in Grover Beach

Who approves development projects in Grover Beach?

The City of Grover Beach. Projects near the ocean also need a coastal development permit because that part of the city is in the California Coastal Zone, and the City publishes a development tracker and an annual report that this guide draws on.

Why is so much of the activity on West Grand Avenue?

West Grand Avenue is the city's main street and the corridor its plans direct larger mixed-use buildings toward. Several of the recent approvals there are four stories with apartments or condominiums over ground-floor commercial space.

Does Glenn Martin Company have a role in these projects?

No, unless a project page says so. We manage and lease property in Grover Beach, and we publish the guide because owners and tenants ask what is coming.

Which projects in Grover Beach are under construction?

As of the dates on their pages: Astound broadband distribution center, Encore mixed-use development, SpringHill Suites hotel, 950 El Camino Real, Trinity mixed-use development and 197 West Grand Avenue. Each page names the record that reports construction and the date it was checked.

What is approved in Grover Beach but not yet documented as started?

1598 El Camino Real hotel and housing, phase 2, Mixed-use development at 261 Rockaway Avenue, Beach Front Plaza mixed-use redevelopment, 201 West Grand Avenue, Grover Beach Lodge, La Quinta hotel at 1598 El Camino Real, phase 1, Sea Salt mixed-use development and 675 West Grand Avenue. An approval or an issued permit is not the same as construction, so these stay listed as approved until a record reports work under way.

What is proposed or under review in Grover Beach?

501 West Grand Avenue mixed-use proposal. These have applications or plans on file but no approval documented in the records reviewed.

What has been completed in Grover Beach since late 2021?

Balay Ko on Barca, Cabins for Change, Cleaver and Clark Commons and Palladium mixed-use development, according to the completion records cited on each page.

Talk with us about a property in Grover Beach

Owners along West Grand Avenue and in the industrial blocks east of Highway 1 ask us about leasing, selling and what a neighboring project means for their building. Tell us about yours.

Or call 805.234.5912. You will hear back from a principal of the firm, Samuel Fox Brennan or Glenn Thomas Martin.